The Collegian

Second passive project awaits sale of first

LAUREN+FRANKEN
Back to Article
Back to Article

Second passive project awaits sale of first

LAUREN FRANKEN

LAUREN FRANKEN

LAUREN FRANKEN

LAUREN FRANKEN

Lauren Franken

Hang on for a minute...we're trying to find some more stories you might like.


Email This Story






Not long after the Oct. 15 ribbon cutting for Brookings’ first passive house, graduate students in the Department of Architecture are already drafting plans for a second energy-efficient, single-family home that will sit just north of the first.

The first house, which sits at 902 3rd Ave., is built to Passive House standards — which includes thickly insulated walls and double or triple paned windows.

The regulations ensure the house is airtight to minimize the need for electric heating and cooling systems and higher air quality.

Though plans are already in the works, construction on a second passive house cannot begin until the first house is sold.

The three bedroom, two and a half bath house is currently priced at $379,000.

“The students are designing the project under the assumption that at some point we’ll sell the house, and hopefully it happens quickly and we can get going on the next project, but we’re going to have to wait for it to sell,” said Charles Macbride, the professor of architecture who oversaw the class that designed the first passive project in 2016.

A passive houses costs, on average, 10 to 12 percent more to build, but monthly energy costs are significantly lower for residents.

“The hope is that new homes are going to be built with better energy efficiency because it not only saves the homeowner money, but it saves on environmental demand,” Macbride said. “It’s designed to take advantage of sunlight, and it’s designed with certain types of equipment so that it doesn’t use energy that it shouldn’t.

Passive houses are designed in an attempt to reach net zero, which means the energy input and energy output of the house equal out.

Instructor of architecture Robert Arlt is overseeing the studio of students designing the second passive house, which he said will combine stylistic elements from the houses it sits between.

“It becomes kind of, in a sense, a Venn diagram of what the two houses look like,” Arlt said.

The architecture department chose the locations for the passive houses with the intent of revitalizing neighborhoods instead of building in the newer developments on the outskirts of Brookings.

“It represents a lot more than just the passive house to us. It’s a house that shows we believe reinvestment in established neighborhoods is something that needs to happen,” Macbride said.

Leave a Comment

If you want a picture to show with your comment, go get a gravatar.




Navigate Left
  • Second passive project awaits sale of first

    News

    20th annual Christmas Celebration rings in the season

  • Second passive project awaits sale of first

    News

    Student Sustainability Council wants to rid of straws on campus

  • Second passive project awaits sale of first

    Campus News

    Wymer discusses changes to international nights

  • Second passive project awaits sale of first

    News

    Campus accessibility: preparing for the future

  • Second passive project awaits sale of first

    News

    Garst-Santos shares passion for Cervantes’ and Spanish history at SDSU

  • Second passive project awaits sale of first

    News

    A call to parenthood: SDSU faculty members’ adoption story

  • Second passive project awaits sale of first

    Campus News

    High-speed SA meeting breaks unofficial record

  • Second passive project awaits sale of first

    News

    Fixed bus route in works through Students’ Association and GAF

  • Second passive project awaits sale of first

    News

    Alumna Wolf-Hall named founding dean of the College of Natural Sciences

  • Second passive project awaits sale of first

    News

    Quarter scale tractor team: learning through competition

Navigate Right
South Dakota State University's Student-Run Independent Newspaper Since 1885
Second passive project awaits sale of first